We’re sponsoring the Building Better Worlds Hackathon. Win $1,000 on our track.Sign up

Talona

Zoom

Decisions from Zoom calls filed to the job they're about.

A 30-minute walkthrough.

Feature overview

  • Decisions pulled from the transcript

  • Action items with a name on each

  • Ask what was agreed

About this integration

OAC meetings and coordination calls decide a lot and write down little. Connect Zoom and Talona reads the transcript of each project call. Decisions and action items go on the record with who said them and when.

  • Reads the transcript once a project call ends.
  • Each decision keeps the speaker and the minute it was said.
  • Action items get an owner and stay open until someone closes them.
  • A decision that changes the work is flagged as a change.
  • Calls that aren't about a project are never stored.
  • Cloud recording with transcripts has to be on in Zoom.

Data and permissions

Transcripts of project calls with their speakers and times. Calls that aren't about a project are dropped.

Nothing in Zoom. Talona reads transcripts and doesn't join or post to a call.

Project facts go into the shared record that everyone on the project can see. Everything else in your account stays yours. Talona works through the account of the person asking and never through a colleague's.

Each connection records when it last delivered. If it goes quiet or its access expires Talona tells you in your direct chat and sends a link to reconnect. Until then answers from this source are marked as behind.

Site content is kept for as long as your contract sets out and is then deleted. The details are in our Privacy Policy.

Discover more integrations

Talona reads the tools your job already runs on and keeps one record of what they say.

Zoom already holds part of the job. Let Talona read it.