Brand
These guidelines let anyone use the Talona name and logo without asking us first. For anything they don't cover write to us with a mockup of what you have in mind.
Download all assetsTalona
The Talona trademark covers the Talona name and logo. Please use them as they are. Don't change them or use them in a way that suggests Talona sponsors or endorses you.
Usage and misuseSymbol
Use the symbol on its own only where the full logo doesn't fit. It also works where several brands appear as symbols side by side.
Avatar
The symbol centred on a solid square. Use it for profile pictures. It survives a circle crop.
Spacing
Keep clear space of at least half the symbol's height on every side of the logo. Nothing else goes inside it.
Colour
The logo is only ever black or white. The website adds one warm accent.
Black
The logo and all text
White
The logo on dark backgrounds
Orange
Buttons on talona.ai
Warm grey
Cards on talona.ai
Typography
Britti Sans draws the wordmark. talona.ai sets everything else in Hanken Grotesk and IBM Plex Mono.
Aa
Hanken Grotesk
ABCDEFGHIJKLMNOPQRSTUVWXYZ
abcdefghijklmnopqrstuvwxyz 0123456789
- Aa 400
- Aa 480
- Aa 600
Aa
IBM Plex Mono
ABCDEFGHIJKLMNOPQRSTUVWXYZ
abcdefghijklmnopqrstuvwxyz 0123456789
- Aa 400
- Aa 500
- Display76 · 0.99 · −4.5%Catch every change
- Heading46 · 1.07 · −3.5%One record per project
- Lead18 · 1.5Talona reads what your job already runs on.
- Body15 · 1.5Every fact is filed with its source and time.
- Label11 · caps · +9%PRESS KIT
- MonoPlex Mono 13talona-lockup-black.svg
Usage
You may use the Talona name and logo to refer to Talona truthfully. That covers writing about us, saying you use Talona and linking to talona.ai.
Anything else needs our written permission first. That includes merchandise, co-branded material and using Talona in the name of another product.
Misuse
Some ways not to use the Talona marks:
- Don't use Talona in the name of your business, product or domain.
- Don't use a name or logo that looks confusingly like Talona's.
- Don't suggest that Talona sponsors or endorses you when it doesn't.
- Don't show the Talona logo bigger than your own name or logo.
- Don't change the logo. That means no new colours or effects and no stretching or rotating or retyping.