We’re sponsoring the Building Better Worlds Hackathon. Win $1,000 on our track.Sign up

Talona

Webhooks

Every change to the record pushed to your own systems.

A 30-minute walkthrough.

Feature overview

  • Each change within a second

  • Signed so you can check it

  • Retried until it lands

About this integration

Subscribe a URL and Talona posts each change to the record as it's saved. Your systems get the newest state of every issue, change and request without polling.

  • Changes post within a second of being saved.
  • Every post carries a signature and a timestamp.
  • A failed post is retried with a longer wait each time.
  • A slow app holds up nobody else. Each subscriber keeps its own place in the feed.
  • Subscribe to some kinds of record only.
  • Ask for a resync and the whole record is sent again.

Data and permissions

Each change carries a sequence number, the kind of record and its version. The record itself comes with it as one document.

Every post has a Talona-Signature header: a timestamp and an HMAC-SHA256 of the timestamp and body made with your secret. Reject a wrong signature or a post older than five minutes.

A failed post is retried after 10 seconds and the wait doubles up to an hour. There's no limit on tries and your place in the feed doesn't move until a post succeeds.

A change can arrive more than once. Keep the highest version you have of each record and ignore older ones.

The document comes as null once a record is gone.

Site content is kept for as long as your contract sets out and is then deleted. The details are in our Privacy Policy.

Discover more integrations

Talona reads the tools your job already runs on and keeps one record of what they say.

Webhooks already holds part of the job. Let Talona read it.