We’re sponsoring the Building Better Worlds Hackathon. Win $1,000 on our track.Sign up

Talona

Slack

The project channels in Slack on the same record as the site chat.

A 30-minute walkthrough.

Feature overview

  • Pick the channels that count

  • Messages filed to the job

  • Ask Talona in a direct chat

About this integration

The office talks in Slack while the crew talks in WhatsApp. Connect Slack and pick the channels that belong to a job. Each message is filed to the right project with its sender and time.

  • Pick the channels to track. The rest are never stored.
  • Threads stay together. A reply lands with the message it answers.
  • Files and photos posted in a channel are read too.
  • A decision in Slack and a report in WhatsApp land on the same item.
  • Talona doesn't post in your channels.
  • A Slack admin may need to approve the app once.

Data and permissions

Messages and files in the channels you pick. Each keeps its sender and time.

Nothing in Slack. Talona reads the channels you pick and messages people from its own number.

Project facts go into the shared record that everyone on the project can see. Everything else in your account stays yours. Talona works through the account of the person asking and never through a colleague's.

Each connection records when it last delivered. If it goes quiet or its access expires Talona tells you in your direct chat and sends a link to reconnect. Until then answers from this source are marked as behind.

Site content is kept for as long as your contract sets out and is then deleted. The details are in our Privacy Policy.

Discover more integrations

Talona reads the tools your job already runs on and keeps one record of what they say.

Slack already holds part of the job. Let Talona read it.