We’re sponsoring the Building Better Worlds Hackathon. Win $1,000 on our track.Sign up

Talona

Updated Nov 12, 2026 · 4 min read

Connect your WhatsApp

Two ways to let Talona read the site's chats. Both take a few minutes and neither asks your crew to install anything.

Two ways to connect

WayGood whenWhat Talona reads
Add Talona to the groupThe job runs in one site group and you want to start todayThat group
Link your own WhatsAppThe job lives in several chats and direct messagesThe chats you choose

You can do both. Each account is connected once.

Add Talona to a site group

  1. 1

    Save Talona's number.

    It's the number you text to reach Talona. That direct chat is where it answers you.

  2. 2

    Add it to the group.

    Like any other member. Talona listens there and never posts.

  3. 3

    Say which job the group belongs to.

    Everything said in a group set to a job is filed to that job.

From then on every message, photo and voice note in the group goes on the record with its sender and its time.

When a new chat appears

A new chat that looks like work gets one question in your direct chat with Talona.

What Talona asks
New chat with Dave Nolan looks like work on 170 Bernard St. Track it? 1 = yes, 2 = no

Reply 1 and it's read from then on. Reply 2 and it stays out.

What Talona never does with your number

  • It never posts from it. Talona messages people from its own number and asks you before each one.
  • It never reads a chat you didn't choose. Those messages are dropped before anything is stored.
  • It never shows your chats to colleagues. Project facts go to the shared record. Everything else stays yours.

If the connection drops

A linked WhatsApp session can disconnect. When a connection goes quiet Talona tells you in your direct chat and sends a link to connect again.

Until then answers that depend on that chat are marked as behind. Old information is never passed off as current.

Next: set up a project.

Your people and documents on the record.

Set up a project

More to read and use.

Your crew already writes it all down. Let Talona read it.