We’re sponsoring the Building Better Worlds Hackathon. Win $1,000 on our track.Sign up

Talona

Updated Nov 12, 2026 · 5 min read

Set up a project

From the first text to a record with your people and documents in it. Most of it is confirming what Talona found.

Before you start

You need very little. Have these to hand and the rest can wait.

  • The project's name and the address of the site.
  • The contact list in whatever form it exists.
  • The schedule and the contract if you have them. Both can be added later.

The six steps

  1. 1

    Tell Talona who you are.

    Your name and company and your role: GC owner or PM or super. Say whether Talona should message you first or only answer.

  2. 2

    Text Talona.

    Save its number and send a first message. From then on that chat is where you ask and where it reports.

  3. 3

    Import what the job already has.

    Give the project a name and its site address. Then drop files or point Talona at Procore or the company drive.

  4. 4

    Turn on sync.

    Say where the job's information lives and switch each place on once. Talona reads it in the background from then on.

  5. 5

    Choose what Talona may do.

    Moving calendar events and sending mail come first. It asks before every message until you tell it not to.

  6. 6

    Invite your colleagues.

    The PM and the super on the same job each get their own chat with Talona.

Steps 4 and 5 can wait. Talona asks again later and names who has to approve a connection.

The contact list comes first

The one document worth finding on day one is the contact list. It may be the project directory or the subcontractor list from buyout.

Talona reads the companies and the people in it with their phones and emails. It notes each person's trade and role and which site they work on. That is how a message from an unknown number becomes a message from the electrician.

Any format works: Excel or a PDF or a photo of a printout.

Three ways to import

WayWhat happens
Drop filesAnything about the job goes in. Talona works out what each file is and reads it
Import from ProcoreYou pick the project. Its directory, locations and schedule come over with open RFIs and change events
Import from the company driveTalona finds the project's folder in OneDrive or Box or Dropbox and the documents in it that matter

Every import ends on one screen that lists what was found and what each thing is. You confirm it before anything goes in.

Everything imported keeps its source. A wrong import can be taken out again.

If there's nothing to import

Start anyway. Talona builds the directory from the chats and the mail it reads and asks you about the gaps.

After setup

  • Ask it something. “What's still waiting on the architect?” is a good first question.
  • Read the morning message. It lists what needs you today and what you're waiting on.
  • Correct it. Tell Talona when something is wrong and it fixes the record.

Connect the site's chats.

Add Talona to the group or link your own WhatsApp.

Connect your WhatsApp

More to read and use.

The job already has everything Talona needs. Set it up this week.