We’re sponsoring the Building Better Worlds Hackathon. Win $1,000 on our track.Sign up

Talona

Procore

What the field says next to what Procore says.

A 30-minute walkthrough.

Feature overview

  • Import a project in one pick

  • The field's version attached to the item

  • Both shown when they disagree

About this integration

Procore holds the managed side of the job. The chat holds what happened today. Talona reads both and attaches what the field says to the Procore item it's about.

  • Pick the project and its directory, locations and schedule come over.
  • Open RFIs, change events and punch items come with them.
  • New and changed items keep arriving after setup.
  • Talona reads Procore and never writes to it.
  • When a message contradicts Procore both stay on the record with their sources.
  • Your Procore admin installs the app once.

Data and permissions

The project's directory, locations and schedule. Its RFIs, change events and punch items.

Nothing. Procore owns what's managed in Procore and Talona only reads it.

Project facts go into the shared record that everyone on the project can see. Everything else in your account stays yours. Talona works through the account of the person asking and never through a colleague's.

Each connection records when it last delivered. If it goes quiet or its access expires Talona tells you in your direct chat and sends a link to reconnect. Until then answers from this source are marked as behind.

Site content is kept for as long as your contract sets out and is then deleted. The details are in our Privacy Policy.

Discover more integrations

Talona reads the tools your job already runs on and keeps one record of what they say.

Procore already holds part of the job. Let Talona read it.