We’re sponsoring the Building Better Worlds Hackathon. Win $1,000 on our track.Sign up

Talona

Daily log

The daily log writes itself.

Talona drafts the day's log from what the site already said. Read it, fix a line and approve it.

A 30-minute walkthrough.
See what's in it

The log you'd write at 3:30

Already written when you get to it.

The day goes into the log while it happens. Not from memory afterwards.

No writing from memory.

The log is built from messages sent while the work was going on.

No chasing headcounts.

Talona asks each sub for the day's report and notes who answered.

No hunting for photos.

Every photo from the day is already on the entry it belongs to.

Everything a daily log asks for.

The same sections your log has today. Filled in from the day's record.

Each section from its own kind of message.

Manpower by company.

Who posted work today, counted per company. It's a floor you can correct and never a guess.

Deliveries from a photo.

A picture of the pallets with no caption still becomes a line with the supplier and what arrived.

Delays with their cause.

A supplier or another trade or the weather. Logged the day it was said.

Visitors and inspections.

Who came to site and what it was about.

Photos that say what they show.

Each one is described and filed under its place and trade.

A draft until you say so.

Talona writes the log. The person in charge puts their name to it.

Approve it from the truck.

Read the draft in your chat. Change a line by telling Talona and approve it with one message.

Sub reports chased for you.

Subs who haven't sent a report get a reminder. The log notes who answered.

Ping your subs

Said and confirmed stay apart.

A sub's own entry is marked as theirs until you confirm it.

Done vs. verified

One record. Everything built on it.

FAQ

Work performed, manpower, deliveries, delays, inspections, visitors, weather and notes, with the photos from the day. Each line comes from a message, a photo or a voice note on the record.

The person who runs the site. Talona drafts the log and never signs it. Where a licensed person has to keep the official log, the draft is ready for them to copy and sign.

From who posted work that day and from what the subs report. It is a floor, so correct it if more people were on site.

Yes. Tell Talona what to change in your chat and it updates the log.

The log uses the same sections and fields as Procore's daily log, so entries carry over without rewriting.

The log shows what was reported and nothing more. With your OK Talona can ask the foreman for a status.

Get the end of your day back.