Check first.
Talona looks at what starts on the next working day. Work that would cover something unchecked gets flagged before it disappears.
How Check first worksDone vs. verified
Talona keeps what a trade says apart from what you've checked. You always know which finished work has had eyes on it.
From said to checked
Three states that never get mixed up
A trade says so
Reported
Finished by their word. Nobody has looked yet.
A repair is claimed
Fix reported
The problem stays open until someone checks the repair.
You or an inspector
Verified
Checked in person with a name and a time.
Before it disappears
Unchecked work is cheap to look at today. It gets expensive once something is built over it.
Talona looks at what starts on the next working day. Work that would cover something unchecked gets flagged before it disappears.
How Check first works“Fixed” from the person who made the repair moves the problem to fix reported. It closes when the lead checks.
“Finished the first side” counts as progress. “Wrapping up for today” changes nothing.
Ask at any time and get the list with who said what.
A pass or a fail is logged with the inspector and the time.
One question gets every item that is reported done with no check behind it.
Ask TalonaWhen finished work has to be redone the record shows what was reported and what was checked.
Done is what a trade reports. Verified means the site lead or an inspector has checked it. Talona records both and never treats the first as the second.
Tell Talona what you checked. A message in the site group or in your own chat with Talona is enough, and a photo or a voice note works too.
The people who lead the site, and inspectors. A trade's own “done” always stays a report.
Work scheduled for the next working day would cover something that is only reported done. Talona flags it so you can look before it disappears behind drywall or tile.
It moves to fix reported and stays open. It closes when the lead confirms the repair.
No. Talona never judges the work. It keeps track of what was said and what was checked.