Look before each unit gets closed up.
Talona knows what tomorrow's work will hide. Drywall in a unit whose insulation nobody has looked at gets flagged the day before.
Check firstMultifamily
The same work repeats in every unit and “done” means something different in each one. Talona files every message to its unit and trade and tells you what nobody has checked.
A photo with no caption still ends up on the right unit and trade.
What a trade says is kept apart from what you've looked at. Unit by unit.
Tomorrow's starts are read against what's still unverified today.
Talona knows what tomorrow's work will hide. Drywall in a unit whose insulation nobody has looked at gets flagged the day before.
Check firstA trade's “done” stays reported until you or an inspector looks. Ask which units still need eyes and get the list.
Done vs. verifiedAsk each trade where they are on a floor. Talona messages every one of them and brings the answers back as one list.
Ping your subsEvery fact is pinned to a place and a trade so the whole building stays one record.
“Board in 3” and “U3 drywall” and “unit three sheetrock” are the same job. Talona files all of it under one unit and one trade.
Project recordA unit or a room is added the first time someone mentions it. Nobody has to set up the job floor by floor.
An imported schedule or a Procore project gives Talona the locations on day one.
From what the message says and the conversation around it. A new unit is added the first time someone mentions it.
No. Units and rooms are added as the work reaches them. An imported schedule or a Procore project gives Talona the locations up front.
Yes. A job holds its buildings and each building holds its floors and units.
Work that would cover something nobody has checked. Talona flags it the day before it starts. More on Check first.
No. They keep writing in the site group the way they do today.
It becomes an item with a company and a unit. A reported fix keeps it open until you've checked the repair.