We’re sponsoring the Building Better Worlds Hackathon. Win $1,000 on our track.Sign up

Talona

Project record

One record of the job that writes itself.

Talona reads your site's group chats and email and files every fact under the right unit and trade. Each one keeps who said it and when.

A 30-minute walkthrough.
See how it works

Let the site keep its own record.

Your crew keeps texting. Talona does the filing.

The old way.

The Talona way.

Everything the site says lands in one place.

Chats and email go through the same record. Nobody has to feed it.

Group chats read quietly.

Talona sits in the site's WhatsApp group and listens. It never posts there, so the crew changes nothing about how they work.

Voice notes and photos become text.

A voice note is transcribed in whatever language it was spoken. A photo gets a plain description of what it shows.

Email reads like any other message.

One email can carry a change and a request and a drawing. Talona reads it whole with its attachments and files each part.

Filed where the work is.

Every fact is pinned to a place and a trade so the record stays one list.

A stable thing to point at.

Three people call the same work three different things. Talona files all of it under one unit and one trade.

Small talk stays out.

Birthdays and lunch plans get no entry. A joke photo of a loose junction box still becomes an issue.

A record that holds up in a dispute.

Talona never decides what's true. It tags what people said and plain rules work out the rest.

Nothing is overwritten.

Every message is kept exactly as it arrived. Edits and deletes are stored as events and the original stays readable.

A claim isn't a fact.

“Done” from a trade stays reported until the lead or an inspector checks it.

Done vs. verified

Contradictions stay visible.

When two people say opposite things both messages stay. The lead decides.

Late messages land on the right day.

A phone that was offline still gets credit for when the message was sent.

Your record goes where you work.

The record is shaped after the tools contractors already use.

Shaped like Procore.

Daily logs, observations and change events use the fields Procore uses. Nothing has to be reinterpreted.

A feed your systems can follow.

Every change to the record goes out by webhook within a second. Or pull it from the API when you want it.

Ask it anything.

Message Talona on WhatsApp and get the answer with the names and times behind it.

Ask Talona

One record. Everything built on it.

FAQ

One structured record per project. Talona reads the site's WhatsApp groups and email and files what people report: progress, problems, requests, deliveries and change orders. Every entry keeps the message it came from, who sent it and when.

No. The crew keeps posting messages, photos and voice notes in the site's WhatsApp group. Talona listens there and never posts.

Nothing. Greetings and chatter get no entry. A message reaches the record only when it says something about the job.

It can misread a message, which is why every entry links back to the message behind it. Talona never decides what is true. A message it can't place goes on a review list and changes nothing until someone places it.

The record follows the edit and drops what a deleted message claimed. The original stays stored, so the history can always be read back.

The record follows Procore's data model, so its entries map onto Procore's tools. Any system can follow the record by webhook or pull it through the API.

Put your site on the record.