We’re sponsoring the Building Better Worlds Hackathon. Win $1,000 on our track.Sign up

Talona

Gmail

Project mail lands on the same record as the site chat.

A 30-minute walkthrough.

Feature overview

  • Project mail filed to the job

  • An email closes a request from the chat

  • Replies you approve before they send

About this integration

Suppliers and architects answer by email while the crew talks in WhatsApp. Connect Gmail once and Talona reads project mail in the background. Each thread is filed to the right job with its sender and time.

  • Only project facts reach the shared record. The rest of your mailbox stays yours.
  • Attachments are read too. A quote or a revised drawing lands on the work it affects.
  • An answer by email closes the request that was opened in the group.
  • Talona drafts replies and sends them from your address once you approve the exact text.
  • Anything legal or priced stays a draft. A person sends it.
  • Not on Gmail? Every project has a forwarding address that works from day one.

Data and permissions

Talona needs read access to your mailbox to find project mail. Only mail about a project goes on the record with its attachments.

Talona drafts mail and sends it from your address after you approve the exact text. Reply 1 to send or 2 to stop.

Project facts go into the shared record that everyone on the project can see. Everything else in your account stays yours. Talona works through the account of the person asking and never through a colleague's.

Each connection records when it last delivered. If it goes quiet or its access expires Talona tells you in your direct chat and sends a link to reconnect. Until then answers from this source are marked as behind.

Site content is kept for as long as your contract sets out and is then deleted. The details are in our Privacy Policy.

Discover more integrations

Talona reads the tools your job already runs on and keeps one record of what they say.

Gmail already holds part of the job. Let Talona read it.