We’re sponsoring the Building Better Worlds Hackathon. Win $1,000 on our track.Sign up

Talona

We build the world

Come build the brain every construction company is missing. Sounds like a lot of work? It is.

See open roles
  • You?

    Connected Talona to the tools a new site runs on

  • You?

    Walked a job site and came back with the roadmap

  • You?

    Built the agent a superintendent texts at 6 am

  • You?

    Shipped a fix the same day a foreman asked for it

  • You?

    Designed the digest a GC owner reads before coffee

A hard problem and a very small team.

Kacper and Ignacy started Talona. They wrote you a letter that is mostly reasons not to apply.

There are two of us at Talona.

We’re engineers and we know construction from the inside. We know what it’s like to make decisions about a site you can’t see.

So we went to the people who run job sites and asked what goes wrong.

They kept telling us the same story. Something changes on site and the news gets lost in a group chat. Then the work gets done twice and somebody pays for it.

So we’re building an agent that reads what a site already sends and keeps the record nobody has time to write.

If you join now you won’t get a manager or a roadmap or a quiet week. You’ll get builders on the phone and problems nobody has solved yet.

You’ll own more than you’re ready for. Some weeks nothing will work.

Most people should look for a different job.

If you’re still reading, write to us.

Not a “normal” software job.

Most of what we build starts as something a superintendent said on a call.

A crane on a steel trestle under towering clouds at Douglas Dam, Tennessee, in 1942

What is Talona?

Talona is an AI agent for construction companies. It connects to the tools a site already uses and reads the messages and photos as they come in.

It keeps a record of who said what and when. Then it flags what’s about to turn into rework and delays.

An Autodesk and FMI study put the cost of bad data in construction at $1.85 trillion in a single year.

A carpenter in a hard hat drilling into a timber at Douglas Dam in 1942

What’s the culture like?

Small. Both founders write code and both get on calls with builders.

Every call is recorded and transcribed. What we hear on those calls decides what we build next.

We run the company the way we want sites to run. If something matters it gets written down.

A crane operator at the controls in his cab at Douglas Dam in 1942

Why choose Talona?

Because it’s early. The first people here will shape how the product works and how the company works.

Because the problem is real. Construction is one of the biggest industries in the world and most of it still runs on phone calls and memory.

And because you’ll see your work used. The people we build for are on site at 6 am and they’ll tell you plainly whether it helped.

A rigger in a hard hat tightening a bolt on a steel beam at Douglas Dam in 1942

Does Talona offer benefits?

Not a long list yet. We’re two people and we won’t pretend otherwise.

Pay and equity depend on the role. Ask us about both on the first call.

You do get a hard hat. You’ll need it for the site visits.

Ready to build?
See our open roles.