We’re sponsoring the Building Better Worlds Hackathon. Win $1,000 on our track.Sign up

Talona

About Talona

We’re building the brain of every construction company.

Talona is an AI agent that connects to existing data sources, and flags any issues in real-time before they turn into rework and delays.

See our product
An apartment tower under construction with a crane on top

$1.85T

Lost worldwide to bad data in a year

$88.7B

Of rework a year caused by bad data

14 hrs

Lost per person each week to searching and rework

20%

How late large projects typically finish

Sources: Autodesk and FMI (2021). FMI and PlanGrid (2018). McKinsey (2016).

Builders told us what’s broken.

We built Talona from conversations with the people who run sites.

“One missed report cost us three months and our next big deal.”
General contractor On a delayed job
“Everything needs timestamps, period.”
Superintendent Healthcare fit-outs
“You gotta repeat the same thing again and again and again.”
Project manager New York GC

Our values

Money leaks on site through rework and delays. It doesn’t leak in the office. So we build for the superintendent first.

If a tool makes a super’s day longer it won’t get used. We judge every feature by whether it saves them a step.

Crews already talk in WhatsApp groups and email. We read what’s there. Nobody on site has to install or learn anything.

Each entry in the record says who said it and when. A claim stays a claim until someone checks it.

When a dispute starts you have the message and the photo and the time.

Talona asks and drafts and reminds. Anything that leaves the site waits for a person to approve it.

A change costs little the day it’s agreed. It costs a lot once it’s built. We flag things while there’s still time to fix them.

We spend our time with supers and project managers and GC owners. What we hear on site decides what we build next.

A framer standing on roof trusses against a blue sky

Building the record (and sharing it).

Download our logos and brand guidelines to use on the web or in print.

Download brand assets

Talona reads the tools your jobs already run on

Want to build this with us?

We’re a small team and we’re hiring soon. Tell us what you’d work on.

See open roles
A framer setting a roof truss lowered by a crane

Catch every change before it costs you.

A 30-minute walkthrough.