We’re sponsoring the Building Better Worlds Hackathon. Win $1,000 on our track.Sign up

Talona

Pull API

Read the site record from your own tools.

A 30-minute walkthrough.

Feature overview

  • The whole record from one call

  • Then only what changed

  • Photos and voice notes too

About this integration

Call the changes endpoint with a token and the record comes back as a feed. Start from zero for everything. After that each call picks up where the last one ended.

  • Start at after=0 for the whole record.
  • Up to 1,000 changes come back per call. A flag says whether more are waiting.
  • Fetch one record as it is now by its kind and id.
  • Fetch the photo, voice note or document a message carried.
  • One token per app. Limit it to some kinds of record.

Data and permissions

Every call carries a bearer token issued to one app.

Each change carries a sequence number, the kind of record and its version. The record itself comes with it as one document.

Each response gives the place to continue from and says whether more changes are waiting.

A change can arrive more than once. Keep the highest version you have of each record and ignore older ones.

The document comes as null once a record is gone.

Site content is kept for as long as your contract sets out and is then deleted. The details are in our Privacy Policy.

Discover more integrations

Talona reads the tools your job already runs on and keeps one record of what they say.

Pull API already holds part of the job. Let Talona read it.