The estimate on our home page.
It uses the rework range from the Construction Industry Institute projects and US Census figures on firm size. Our one assumption is labelled as ours.
Try the estimatePublished studies on change orders, rework and lost time on site. Each one is linked so you can check it yourself.
See the studiesWhat each one measured and what it found. Vendor surveys show direction more than precise figures, so we say which is which.
AIA Contract Documents
Industry data18,229 US projects
Hwang, Thomas, Haas and Caldas · ASCE
Peer-reviewed study359 projects from the Construction Industry Institute
FMI and PlanGrid
Vendor survey599 construction leaders
Navigant Construction Forum
Consultancy study1,362 projects and more than a million RFIs
Autodesk and FMI
Vendor surveyMore than 3,900 construction professionals worldwide