We’re sponsoring the Building Better Worlds Hackathon. Win $1,000 on our track.Sign up

Talona

Revit

Model changes reach the field the day they're issued.

A 30-minute walkthrough.

Feature overview

  • Every revision on the record

  • Changes matched to the work they affect

  • The current sheet in one text

About this integration

A late change to a drawing is how rework starts. Connect Revit and Talona reads each new revision as it's issued. Changes are matched to the work they touch and the crew doing it hears the same day.

  • Reads sheet sets published from the model as they're published.
  • Each revision keeps its number and issue date. The one before is marked superseded.
  • A clouded change is matched to the work it affects on site.
  • The crew doing that work hears about it in the chat.
  • Anyone can ask for the current sheet and get it in one text.
  • Sheets come from the set you publish. The model itself stays with the designers.

Data and permissions

Sheet sets published from the model with their revision and date.

Nothing in Revit. Talona reads drawings and never edits them.

Project facts go into the shared record that everyone on the project can see. Everything else in your account stays yours. Talona works through the account of the person asking and never through a colleague's.

Each connection records when it last delivered. If it goes quiet or its access expires Talona tells you in your direct chat and sends a link to reconnect. Until then answers from this source are marked as behind.

Site content is kept for as long as your contract sets out and is then deleted. The details are in our Privacy Policy.

Discover more integrations

Talona reads the tools your job already runs on and keeps one record of what they say.

Revit already holds part of the job. Let Talona read it.