We’re sponsoring the Building Better Worlds Hackathon. Win $1,000 on our track.Sign up

Talona

Nov 13, 2026 · 4 min read

Talona sponsors the Building Better Worlds Hackathon in Vienna

On November 13 and 14, 2026 the Building Better Worlds Hackathon takes place in Vienna. Talona sponsors one of its tracks, Context for the Physical World, with a $1,000 prize for the winning team.

Kacper GadomskiCo-Founder & CEO, Talona

Poster of the Building Better Worlds Hackathon by proximata, jointly with START Vienna and powered by HOIV, with the logos of its partners and sponsors, Talona among them

The hackathon

The Building Better Worlds Hackathon is the flagship hackathon of proximata, a builder space and tech agency in Vienna. It is organized together with START Vienna and HOIV, the Home of Innovation, which also hosts it.

Teams of two to four get a real case from a real company and 24 hours to build something for it. The cases sit in four themes: systems for built space, robotics and embodied AI, AI systems and agentic infrastructure, and fintech and crypto.

Each company picks the winner of its own track. The track winners then pitch to an outside jury of investors, founders and tech leads. The prizes add up to more than €290,000 in value, most of it tools, credits and subscriptions from the sponsors.

WhenWhat
Friday, November 13, 12:00Panel with Hubert Rhomberg, CEO of Rhomberg
Friday, 14:00The hackathon starts
Saturday, November 14, 11:00Workshops by n8n and Adaption
Saturday, 15:00Code freeze
Saturday, 16:00Winners announced and demos
Saturday, 18:00End and networking

All times are Vienna time.

Why construction needs context

Construction is one of the oldest industries in the world and one of the last to go digital. A building site turns into a different place every week. Decisions get made in group chats and email threads. Many never reach the people who need them in time.

The cost shows up as rework and delays. Bad data and miscommunication cost the global construction industry an estimated $1.85 trillion in 2020.

AI can now reason about almost anything. What it still lacks is context about the physical world: who is doing what and what changed since yesterday. A model can read a messy voice note or check a photo against a drawing. But it can't tell whether the crew about to close a wall has the latest plans.

That gap is what we work on. Talona pulls every chat, email, photo and file from a construction job into one record, and gives each person running it an assistant.

Our track: Context for the Physical World

The track is about closing that gap. We gave the teams two ways in.

  • Catch it early. Take a swing at catching problems on a construction site before they turn into rework and delays.
  • Show what comes next. Build a live picture of a place that people, agents and robots can act on.

The winning team takes home $1,000 and goes on to pitch to the jury.

The other tracks

Six more challenges run next to ours.

  • DB tech: RadiCal. A submission plan goes in. Traceable quantities and a price come out, with every value carrying its source and confidence. €2,500 prize.
  • Rhomberg: PLATO · CLARA Future. Run a 40-room self-check-in hotel through a full year of operations with agents and robots, then feed what you learn back into the next building. €1,500 prize.
  • TU Wien Robotics Club: Hack the D1. No docs, no API, 24 hours. Unlock every sensor on a full-size commercial service robot, then make it answer the door.
  • Biscuit: Build the Missing Tools. Find what a company is missing and build two or three connected applications that keep its teams working together. More than $1,000 in tokens.
  • proximata: Think Fast. A local decision engine that answers typed questions with calibrated probabilities in milliseconds, with the network switched off. Special prize.
  • Crypto Club Vienna: Bringing Crypto to Everyday Life. Take something people already do and put crypto underneath it. A working prototype is required.

Who makes it happen

The organizers are proximata, START Vienna and HOIV.

Partners

Sponsors

Next to Talona, the hackathon is sponsored by n8n, Rhomberg, techbold, Maritime, Biscuit, Adaption, Lovable, Red Bull, FEODOS and DB tech.

Thank you to the proximata team for putting builders, students and companies in one room for a weekend.

Take part

The hackathon is held in person at HOIV, Arsenalstraße 11, 1030 Vienna. Places are limited and registration goes through the hackathon's page.

Building Better Worlds Hackathon.

November 13 and 14, 2026 at HOIV in Vienna.

See the hackathon

Building on our track and want to know more about construction sites or about Talona? Write to us.

Sources

More from the blog.

Rather see it on your own job? We'll walk you through it.